Factory equipment package
List sprinkler heads, risers, laterals, valves and the fittings the supplier must quote. Request a bill of materials with dimensions, connection type and material for each line. Specify system flow rate in m³/h or gpm and pressure at the operating point rather than a pump name alone.
Ask which filtration and fertigation items are included. Confirm spare nozzles, seals and manuals as separate lines, and flag substitute materials before commercial comparison.
